3
4 Site Layout Planning Elements A well planned site including all temporary facilities and utilities lead to 1) increasing productivity and safety, 2) reducing area(s) needed for temporary construction, and 3) maximizing utilization The following points should be considered in good site layout 1 SafetyThe setting out is done to locate pile position, pile cap, column position, beam bottoms and slab boundary in the site Setting out is done with the reference to grid lines When the grid lines are given in the drawing, setting out are done with reference to these grid lines using any type of technique means Suring angles or distances
3 4 5 method of setting out a building
3 4 5 method of setting out a building-Setting out construction works 13 Worksheet Activity Setting out the building perimeter S2 Work method 1 Clear the ground where the house will be located and ensure that it is level 2 Place solid pedestals on all corners, approximately 15 m awayTo locate point G and H, straight line are set out using 345 triangle rule and distance XG and XH which is known is marked on those lines After the four corners (X, X, G and H) have been located, drive stakes at each corner Dimensions are determined accurately during each step LAYING OUT AN IRREGULAR BUILDING SITE
Set Out Masonry Structures Ppt Video Online Download
The method of setting out is the reverse of surveying process The process involves the positions and levels of building lines and road alignments shown on the construction plans to be established on the ground by various techniques and instruments A building can be set out by taking referencing from an already established baselineUsing the 345 method for squaring corners, and a framing square will help ensure your corners are square To create corners, we use the 345 rule derived from the Pythagorean theorem of basic geometry A 2 B 2 = C 2🕑 Reading time 1 minuteSetting out of building foundation trenches is the process of laying down the excavation line and centerline on the ground based on the foundation plan The setting out process is also called as ground tracing that is performed before commencing the excavation process Once the design of foundation is complete, a
The 3 4 5 method is an application of the Pythagoras Theorem ie Forming right Angle Most times, 2 or 3 people are involve in this 3 meters is Measure from the Parallel Line created, then 4 Meter Away from the First point forming a Right Angle, you use your Measuring tape to Confirm the distance between the 3m point noted at the parallel line and the 4m noted at3 Building Construction Manual SKAT 4 Joints in Masonry Module MM13 Habitat Polytech, Richmar and testing methods of building materials that are most commonly used in housing construc 5 MODULE 1 MODULE 2 MODULE 3 MODULE 4 MODULE 5 MODULE 1 It is therefore advisable to first set out a reference rectangle either out side the limits of the excavation or along the centre lines of the outside walls of the building and then to locate each centre by means of coordinates with reference to the sides of this rectangle Both the methods of forming reference rectangle and setting out the
3 4 5 method of setting out a buildingのギャラリー
各画像をクリックすると、ダウンロードまたは拡大表示できます
「3 4 5 method of setting out a building」の画像ギャラリー、詳細は各画像をクリックしてください。
「3 4 5 method of setting out a building」の画像ギャラリー、詳細は各画像をクリックしてください。
「3 4 5 method of setting out a building」の画像ギャラリー、詳細は各画像をクリックしてください。
「3 4 5 method of setting out a building」の画像ギャラリー、詳細は各画像をクリックしてください。
「3 4 5 method of setting out a building」の画像ギャラリー、詳細は各画像をクリックしてください。
「3 4 5 method of setting out a building」の画像ギャラリー、詳細は各画像をクリックしてください。
「3 4 5 method of setting out a building」の画像ギャラリー、詳細は各画像をクリックしてください。
「3 4 5 method of setting out a building」の画像ギャラリー、詳細は各画像をクリックしてください。
「3 4 5 method of setting out a building」の画像ギャラリー、詳細は各画像をクリックしてください。
「3 4 5 method of setting out a building」の画像ギャラリー、詳細は各画像をクリックしてください。
「3 4 5 method of setting out a building」の画像ギャラリー、詳細は各画像をクリックしてください。
Setting Out for Construction is an online resource which teaches you the basics of setting out using a level and total station The course includes over 45 hours of video content Good setting out is not just about achieving the required accuracy, but about getting the work done quickly, efficiently and professionally11 The method of setting out of a building on site is described in terms of Building Consent Authority approved documents NZQA Expiring unit standard version 4 Page 2 of 3 Building and Construction Industry Training Organisation SSB Code